1 |
Overburden Removal work at Medapalli OCP, RG-I Area |
The Singareni Collieries Company Limited |
11200.00 |
2 |
Hiring of Plant & Mining Machineries for working in Kumaraswamy Iron Ore Mine. |
NMDC |
1024.29 |
3 |
Hiring of HEMM for excavation of coal and transportation to surface coal stock yard including associated arrangements. |
NTPC Ltd |
146.47 |
4 |
Overburden Removal work at AMLOHRI OCP of NCL. |
Northern Coalfields Limited |
1518.5 |
5 |
Overburden Removal work at West Section of JAYANT OCP of NCL. |
Northern Coalfields Limited |
7850.00 |
6 |
Overburden Removal work at DUDHICHUA OCP of NCL. |
Northern Coalfields Limited |
1221.64 |
7 |
Overburden Removal work at JAYANT OCP of NCL. |
Northern Coalfields Limited |
1729.32 |
8 |
Extraction of 46.272 LBCM of coal/shale with Surface Miner, including Loading, Transportation, Dumping etc., at Pit-III of Koyagudem OCP-II, Yellandu area.
|
The Singareni Collieries Co Ltd, Telangana
|
435.02
|
9 |
Overburden Removal work at Koyagudem OCP, Yellandu Area.
|
The Singareni Collieries Co Ltd, Telangana
|
1338.63
|
10 |
Blast hole drilling, controlled blasting with shock tube initiation, excavation, loading Transportation and dumping etc, of Overburden at Srirampur OCP, Srirampur Area.
|
The Singareni Collieries Co Ltd, Telangana
|
6312.30
|
11 |
Blast hole drilling controlled blasting with shock tube initiation excavation loading transportation and dumping etc., of overburden at block-D of Manuguru Opencast Project-IV
|
The Singareni Collieries Co Ltd, Telangana
|
1732.28
|
12 |
Blast Hole Drilling, Controlled Blasting with Shock tube Initiation, Excavation, Loading, Transportation, Dumping, etc., of Over Burden at A & B block of Gouthamkhani Opencast Project.
|
The Singareni Collieries Co Ltd, Telangana
|
1415.22
|